Town & County

SR 224 Bus Rapid Transit construction prompts temporary signal shutdown at Olympic Parkway

PARK CITY, Utah — Traffic signals at the Olympic Parkway intersection will be temporarily out of service Monday, Aug. 31, as crews switch the intersection to a new signal control system.

The work is scheduled from 8 a.m. to 3 p.m. Police officers will supervise traffic while the signals are offline, and drivers should expect delays through the area.

Later this week, construction crews will continue excavating and installing storm drains along the corridor.

Drivers and pedestrians are asked to follow posted sidewalk closures and detour signs and stay out of active construction areas while traveling through the corridor.

  • TAGGED:
TownLift Is Brought To You In Part By These Presenting Partners.
Advertisement

Add Your Organization

118 views