The proposed excavation plan would involve two cuts with a terrace between. Each cut would be 35 – 40 feet deep and approximately 130 feet long, which some fear would weaken the hillside causing a potential landslide.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed